SIMEONOVSKO 12 consists of two harmoniously complementary buildings, united by extensive green space, and offers modern apartments with functional layouts, built with high-quality materials and contemporary solutions. The buildings impress with their modern exterior and facades that provide abundant natural light, thanks to the high degree of glazing.
The strategic location of the project offers the best of both worlds - the dynamic urban life and the tranquility and proximity to nature. The spacious apartments and business spaces provide comfort and reveal breathtaking views, while also featuring high-quality insulation and windows for high energy efficiency.
The building is located in one of the most attractive and rapidly developing areas of the city, providing quick access to the main transport arteries of the capital, as well as immediate proximity to bus stops, kindergartens, schools, and Sofia Zoo. Situated at bul. "Simeonsko Shossee" 12 - between 'Simeonsko Shossee' and 'Philip Kutev' boulevards, SIMEONOVSKO 12 offers the possibility of quick travel to the city center while allowing for privacy and tranquility due to its closeness to Loven Park, Sofia Zoo and Vitosha.
SIMEONOVSKO 12 contains 136 apartments. They stand out with functional and bright spaces with individual character and convenient architectural layouts.
On the ground floor, there are 4 commercial spaces offering everything necessary for the convenience of the residents of the building. The photovoltaic power plants on the roof of the building will produce more than 110,000 kWh of clean energy per year, fully covering the consumption of all energy consumers in the common areas of the complex.
The landscaping project aims to improve and enhance the exterior space through vegetation construction and park furnishings, achieving a balance between built-up areas and vegetative areas within the urban planning parameters. Coniferous species and broadleaf trees, flowering bushes with long blooming periods, and decorative grasses will be provided to ensure a natural environment and comfort for the residents of the complex.
Heating in the apartments is provided through installations with gas wall boilers and underfloor heating with serpentine pipes and towel radiators for sanitary rooms. Cooling during the summer months will be achieved using inverter air conditioning units for direct evaporation. In the higher floors of Building B, heating and cooling is provided by a system consisting of a heat pump unit, underfloor heating, and wall-mounted fan convectors. Heat will be retained in your home thanks to the quality insulation and window structures that maintain a constant temperature indoors.
The water supply for household and fire needs is from the street water pipeline. The disposal of domestic wastewater and rainwater from the buildings is via combined sewage networks at the basement level. The rainwater drainage system is resolved through funnels and linear drains, with part of the rainwater collected in a reservoir for irrigation purposes.
The electrical system is independently designed for each building for easier operation. The connection of the building to the electrical network is carried out through a newly built transformer station. The number of light fixtures and outlets in each apartment is optimally designed for the needs of the residents. Lighting in the staircase and corridors is controlled by light fixtures with built-in presence sensors.
High-tech, comfortable, and silent electric passenger elevators with no machine room – GEARLESS drive with 90% efficiency, gearless permanent magnet synchronous motor with VF control in a closed circuit.
To meet the needs of the residents of the building, the underground levels of SIMEONOVSKO 12, include 153 parking spaces and 12 car garages. There are also areas designated for bicycle parking.
Your safety and peace of mind are our priority. SIMEONOVSKO 12 will feature video surveillance and round-the-clock security at the building's entrance. The security and convenience of residents will be ensured with controlled access to the underground levels and entrances of the buildings.
10 min
1 min
10 min
8 min
10 min
10 min
15 min
11 min
15 min
Foundations and ground work
Construction of underground levels
Reinforced concrete construction
Completion of "Rough construction"
Internal installations
Facades and roof systems
Common areas and landscaping
Act 16 and permission to use